Sales Order Terms and Conditions
Sales Order Terms and Conditions
Laws and building and safety codes governing the design and use of AAP’s products, and specifically aluminium composite materials, vary widely. It is the responsibility of the owner, the architect, the general contractor, the installer and the fabricator/transformer, consistent with their roles, to determine the appropriate materials for a project in strict conformity to all applicable national, regional and local building codes and regulations.
