Dennis Maes Justice Center |
|
|
Pueblo, Colorado, USA |
Back to List of Projects |
|
|
Architect
DLR Group
Colorado Springs, Colorado
General Contractor
H.W. Houston Construction Co.
Pueblo, Colorado
Panel Fabricator/Installer
Engineered Wall Systems, Inc.
Salt Lake City, Utah
Panel Type
Reynobond® 4 mm ACM (aluminum composite material), FR (fire-resistant) core
Quantity
45,200 square feet
Color
Classic Bronze Colorweld® 500 paint coating; Fawn Metallic custom Colorweld® 500XL paint coating
Panel Application
Rear-ventilated, rout-and-return, dry-joint rainscreen
Project Summary:
Balancing the Face of Justice: New Justice Center Clad in Reynobond® Panels and Kawneer Products Drawing inspiration from Pueblo’s history, heritage and vitality, the new Dennis Maes Justice Center masterfully fulfills Pueblo County’s desire to replace an aging ‘60s-era courts building with an iconic new justice center that links the historic Downtown and Riverwalk Districts while also improving the urban experience and reenergizing the downtown commercial district. Designed to express the dignity of the courthouse and create a timeless feeling of strength, the high-performing building envelope features Kawneer curtain wall, Reynobond® ACM and precast concrete material.
Products Used:
Reynobond ACMProject Report (PDF):

